01. | On a scale of map, 0.6 cm represents 0.6 km. If the distance between the points on the map is 80.5 cm, then actual distance between these points Is | |||||||||||
|
02. | A man completes 5/8 of a job in 10 days. At this rate, how many more days will it take him to finish the job? | |||||||||||
|
03. | If the price of 6 toys is Rs. 264.37, what will be the approximate price of 5 toys? | |||||||||||
|
04. | 36 Men can complete a piece of work in 18 days. In how many days will 27 men be able to complete the same work? | |||||||||||
|
05. | If a certain number of people can dig earth 100m deep, 25m long, and 30m broad in 12 days, then find the number of days the same number of people will require to dig earth 75m deep, 20m long and 50m broad. | |||||||||||
|
06. | An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth? | |||||||||||
|
07. | In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal? | |||||||||||
|
08. | Running at the same constant rate, 6 identical machines can produce a total of 270 bottles per minute. At this rate, how many bottles could 10 such machines produce in 4 minutes? | |||||||||||
|
09. | A two storeyed building is to be completed in 48 days. To meet the deadline 54 men were employed and were made to work for 10 hours a day. After 30 days 5/9th of the work was completed. How many more workers should be employed to meet the deadline if each workers are now made to work 8 hours a day? | |||||||||||
|
10. | A flagstaff 17.5 m high casts a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be | |||||||||||
|